91小视频-国产精品午夜福利-天天做天天爱-伊人一区二区三区-五月开心婷婷-免费成人小视频-中文字字幕码一二三区-日本美女一区二区三区-av片网-精品乱码一区二区三四区视频-91在线无精精品入口-色屁屁ts人妖系列二区-91久久亚洲-热久久伊人-亚洲一本在线-欧美巨大荫蒂茸毛毛人妖-精品视频一区二区三区四区五区-久久久久9-在线五月天-成人黄色片免费-涩涩涩综合-性av免费-99re8在线精品视频免费播放-91麻豆精品国产自产在线-欧美精品中文字幕亚洲专区

News

RIH Dual Tubing Project in Ecuador

Date 2009-09-28

MARIANN- 24 well, Hilong dual tubing project, is located in TARAPOA area of Ecuador. The artificial bottom hole of MARIANN- 24 is 9367ft depth, and its two target layers are each located at 7141.39ft and 7376.77ft depth. The client has requested the operation at both layer to be carried out simultaneously. Since this is the first time for Hilong to operate the dual tubing project, every one of HILONG-3 fells the great pressure of this challenge. The success of dual tubing project has doubled output of MARIANN- 24 well; from 1000 barrels per day to 2000 barrels per day.


In order to perform the dual tubing project, HILONG-3 has introduced the advanced device,dual tubing hydraulic tongs (with torque gauge and recording indicator), dual tubing air spider and slip and dual tubing air spider elevator. In addition, HILONG-3 has also cooperated with the top oil service companies, Schlumberger and Weatherford, for the technology aspects.


This project started at 16:00 of September 12 and finished at September 30. It only took 18 days for HILONG-3 to reach the 7141.38ft and 7376.77ft depth.


The Ecuador client had great feedback about dual tubing project of HILONG-3. This is also the landmark for Hilong in the international market.