91小视频-国产精品午夜福利-天天做天天爱-伊人一区二区三区-五月开心婷婷-免费成人小视频-中文字字幕码一二三区-日本美女一区二区三区-av片网-精品乱码一区二区三四区视频-91在线无精精品入口-色屁屁ts人妖系列二区-91久久亚洲-热久久伊人-亚洲一本在线-欧美巨大荫蒂茸毛毛人妖-精品视频一区二区三区四区五区-久久久久9-在线五月天-成人黄色片免费-涩涩涩综合-性av免费-99re8在线精品视频免费播放-91麻豆精品国产自产在线-欧美精品中文字幕亚洲专区

News

Drilling of Hilong’s Comprehensive Technical Service Well Rajani-5 Starts

Date 2016-03-23

(March 23, 2016, Shanghai) Hilong Oil Service & Engineering Pakistan (Private) Ltd. successfully started an integrated service project to drill well Rajani-5 on March 21, 2016, with drilling fluid, directional drilling and bits services.
 

The designed TD of Rajani-5 is over 14000ft, estimated bottom hole temperature(BHT) is as high as 170℃, the highest mud weight is as high as 14ppg. It is a rare deep and high-temperature well in Rajani block, giving extreme difficulty to drill.
 

Hilong introduced UEPL with customized solutions of drilling fluid, directional drilling and bits in the 2nd half of 2015. After a number of technical exchanges and business trip to Hilong, UEPL released PO to Hilong to provide integrated service of well Rajani-5.

 

Dai Daliang, senior vice president of Hilong Group and general manager of Oil Service Business said, “the Rajani-5 well is the first oversea integrated oil service project of Hilong, marking a big step forward on the part of Hilong towards becoming an integrated oil service supplier.”

The Site of the Rajani-5 Well